The objective of this project was to identify and correct the most repetitive types of defects in the production process of steel and iron parts, in order to reduce the percentage of non-conforming parts. The methodology used is for its purpose it is applied, for its explanatory level, for its quantitative approach, of pre-experimental design and it consisted in the application of Pareto and Ishikawa diagrams; Lean methodology, 8-step methodology, Kaizen event, ERP and the 5s tool. The results were: the reduction of non-conforming parts from 3.96% to 2.71%, an approximate saving of S /. 195,905.00 nuevos soles, increase in customer service capacity, reduction of overtime for personnel and operating equipment, as well as for molding waiting time. It is concluded that the use of the Lean methodology, supported by the other methodologies used in this project, allows the identification of the most repetitive defects, as well as the improvement of operability, efficiency and profitability in the foundry industry.
Lecturas por mes y tendencia
Barras: vistas del resumen y lecturas de archivos (tracker + índice). Línea punteada: tendencia lineal y predicción de 3 meses (estimación estadística, no un dato).
Palabras clave
non-conforming partsproductive processLean methodologyParetoIshikawa5SQuality controlpiezas no conformesproceso productivoMetodología Lean